Skip to content
Celebrating 250 Years of American Freedom, All Year Long! More Horsepower. More Burnouts.
Celebrating 250 Years of American Freedom. More Horsepower. More Burnouts.

Country

Availability: Stock Reported Available

2008-2014 Dodge Challenger LED Chrome Headlights

Save 17% Save 17%
Original price $600.00
Original price $600.00 - Original price $600.00
Original price $600.00
Current price $499.99
$499.99 - $499.99
Current price $499.99

2008–2014 Dodge Challenger LED Chrome Headlights

LED projector headlights with chrome housings swap directly into your Challenger. Factory-style integration means no custom wiring or mounting—bolt them in and you're done. The LED setup runs cooler and lasts longer than halogen, with sharper light output and a modern look that actually functions.

✓ Ships from FL Warehouse ✓ Factory Mounting Points ✓ LED Projector Design
Key Features
  • LED projector lenses - Sharper beam pattern and reduced glare compared to reflector designs
  • Chrome housing - Polished finish that stands out without looking bolted-on
  • Direct bolt-in fit - Uses factory mounting and electrical connections; no adapters needed
Specs
  • LED projector headlights with chrome housing
  • Pair (left and right)
  • Factory-style connector compatibility
Whats Included
  • Pair of LED chrome headlights
Frequently Asked Questions

Do these plug straight into the factory wiring harness?

Yes. These are designed to use your Challenger's original connectors and mounting points—no rewiring or harness adapters required. Just remove the old headlights, drop these in, and secure them at the factory positions.

Will I need to aim these after installation?

Most LED projector headlights require a trim or adjustment after install to optimize beam height and direction. Refer to your vehicle's service manual or the included instructions for aiming procedures to ensure proper visibility and legal compliance.

Are these street-legal?

LED projector headlights designed for your vehicle are engineered to meet standard road requirements. Always verify local regulations in your area, as some jurisdictions have specific rules about aftermarket lighting. Test them before relying on them as your primary lights.

Processing & Shipping Overview

Processing occurs before shipping.

Most in-stock items typically process within 2–3 business days before shipment or pickup. Expedited shipping options affect transit time after an order ships and do not speed up processing.

Made-to-order, special-order, vendor drop-ship, and freight items require additional processing time before shipping. Any extended lead times will be noted on the product page when applicable.

For the most up-to-date order status or lead time questions, please contact sales@smgspeed.com or use live chat during business hours.



Compare products

{"one"=>"Select 2 or 3 items to compare", "other"=>"{{ count }} of 3 items selected"}

Select first item to compare

Select second item to compare

Select third item to compare

Compare