BBK 89-92 GM 305 350 Twin 52mm Throttle Body BBK Power Plus Series
BBK Performance throttle bodies are designed as a direct replacement for the restrictive stock factory throttle body. All BBK Power Plus throttle bodies offer OEM drive ability but with up to 30% improved airflow for improved horsepower, torque and throttle response. Every BBK throttle body is CNC Machined from a new high quality 356 aluminum casting and assembled with features like OEM style die stamped throttle linkages, double sealed bearings, and o ringed throttle shafts to make every BBK throttle body the best on the market today. All BBK Performance throttle bodies are designed to improve performance and they work with the vehicles factory tune. No tune is required and BBK throttle bodies are available for many late model American muscle cars and trucks.
Installation InstructionsWarranty
Installation Instructions
- Twin 52mm Design - Direct Fit Replacement - Increased Airflow For Better Throttle Response & Performance
- Designed and Manufactured in USA
This Part Fits:
| Year | Make | Model | Submodel |
|---|---|---|---|
| 1989-1990 | Chevrolet | Camaro | Iroc-Z |
| 1989-1992 | Chevrolet | Camaro | RS |
| 1992 | Chevrolet | Camaro | RS Heritage Edition |
| 1991-1992 | Chevrolet | Camaro | Z28 |
| 1992 | Chevrolet | Camaro | Z28 Heritage Edition |
| 1989-1992 | Chevrolet | Corvette | Base |
| 1990-1992 | Chevrolet | Corvette | ZR-1 |
| 1991 | GMC | Syclone | Base |
| 1992-1993 | GMC | Typhoon | Base |
| 1989-1992 | Pontiac | Firebird | Base |
| 1989-1992 | Pontiac | Firebird | Formula |
| 1989-1992 | Pontiac | Firebird | Trans Am |
| 1989-1992 | Pontiac | Firebird | Trans Am GTA |
Processing & Shipping Overview
Processing occurs before shipping.
Most in-stock items typically process within 2–3 business days before shipment or pickup. Expedited shipping options affect transit time after an order ships and do not speed up processing.
Made-to-order, special-order, vendor drop-ship, and freight items require additional processing time before shipping. Any extended lead times will be noted on the product page when applicable.
For the most up-to-date order status or lead time questions, please contact sales@smgspeed.com or use live chat during business hours.