DV8 Offroad 20-24 Jeep Gladiator JT Fender Deletes
Our Fender Deletes provide clearance for maximum articulation. The hardware is designed to sit flush with the deletes to minimize space, while the overall slim design offers the best clearance possible. Constructed out of 3.5mm plate steel and finished with a micro-texture black powder coat, our deletes are made to provide extra protection from the elements. Retain full utility with the included plug and play amber turn signal lights. Installation is straightforward with minimal trimming required.
- Designed to Optimize Articulation when Rock Crawling
- Bolt-On Installation with No Drilling Required
- Features Plug and Play Amber Turn Signals
- Micro-Texture Black Powder Coat Finish
- Constructed out of 3.5mm Plate Steel
- All Mounting Hardware Included
This Part Fits:
| Year | Make | Model | Submodel |
|---|---|---|---|
| 2021 | Jeep | Gladiator | 80th Anniversary |
| 2020,2022 | Jeep | Gladiator | Altitude |
| 2023 | Jeep | Gladiator | Freedom |
| 2021-2023 | Jeep | Gladiator | High Altitude |
| 2024-2025 | Jeep | Gladiator | High Tide |
| 2024 | Jeep | Gladiator | Jeep Beach |
| 2020 | Jeep | Gladiator | Launch Edition |
| 2020-2026 | Jeep | Gladiator | Mojave |
| 2024-2026 | Jeep | Gladiator | Mojave X |
| 2024-2025 | Jeep | Gladiator | NightHawk |
| 2020-2023 | Jeep | Gladiator | Overland |
| 2020-2026 | Jeep | Gladiator | Rubicon |
| 2024-2026 | Jeep | Gladiator | Rubicon X |
| 2020-2026 | Jeep | Gladiator | Sport |
| 2020-2026 | Jeep | Gladiator | Sport S |
| 2021-2026 | Jeep | Gladiator | Texas Trail |
| 2021-2026 | Jeep | Gladiator | Willys |
| 2021-2023 | Jeep | Gladiator | Willys Sport |
Processing & Shipping Overview
Processing occurs before shipping.
Most in-stock items typically process within 2–3 business days before shipment or pickup. Expedited shipping options affect transit time after an order ships and do not speed up processing.
Made-to-order, special-order, vendor drop-ship, and freight items require additional processing time before shipping. Any extended lead times will be noted on the product page when applicable.
For the most up-to-date order status or lead time questions, please contact sales@smgspeed.com or use live chat during business hours.