Skyjacker 2018 Jeep Wrangler JL 4 Door 4WD (Non-Rubicon) Long Travel 2 Stage 2in-2.5in Coil System
Skyjacker Suspensions suspension lift kits provide a smooth, comfortable ride, while responding to on or off-road conditions. They help you get the right height, clearance, and attitude on your truck and maintain that factory ride quality, while improving handling. They come with all of the necessary mounting hardware and detailed instructions, and are available for 2WD or 4WD vehicles.
Installation Instructions- Components Powder Coated Black To Resist Corrosion
- Responds Well To Off-Road Conditions
- Provide Smooth Comfortable Ride
- Greater Level Of Performance
- Limited Lifetime Warranty
This Part Fits:
| Year | Make | Model | Submodel |
|---|---|---|---|
| 2023 | Jeep | Wrangler | High Altitude |
| 2023-2024 | Jeep | Wrangler | Sahara |
| 2023 | Jeep | Wrangler | Sahara Altitude |
| 2023 | Jeep | Wrangler | Sport Altitude |
| 2021 | Jeep | Wrangler | Unlimited 80th Anniversary |
| 2021 | Jeep | Wrangler | Unlimited Freedom |
| 2021-2022 | Jeep | Wrangler | Unlimited High Altitude |
| 2021 | Jeep | Wrangler | Unlimited Islander |
| 2018-2019,2021-2022 | Jeep | Wrangler | Unlimited Sahara |
| 2021-2022 | Jeep | Wrangler | Unlimited Sahara Altitude |
| 2018-2019,2021-2022 | Jeep | Wrangler | Unlimited Sport |
| 2021-2022 | Jeep | Wrangler | Unlimited Sport Altitude |
| 2018-2019,2021-2022 | Jeep | Wrangler | Unlimited Sport S |
| 2021-2022 | Jeep | Wrangler | Unlimited Willys |
| 2021-2022 | Jeep | Wrangler | Unlimited Willys Sport |
Processing & Shipping Overview
Processing occurs before shipping.
Most in-stock items typically process within 2–3 business days before shipment or pickup. Expedited shipping options affect transit time after an order ships and do not speed up processing.
Made-to-order, special-order, vendor drop-ship, and freight items require additional processing time before shipping. Any extended lead times will be noted on the product page when applicable.
For the most up-to-date order status or lead time questions, please contact sales@smgspeed.com or use live chat during business hours.